Skip to content

GrønGas Vrå A/S

By Biocarb Solution ApS

In stock
0
Durability
CORC 1000+
Country
Denmark
Geologically Stored Carbon

project milestones

Certification journey

We track the progress of a carbon removal project through our certification framework. This roadmap moves from a preliminary assessment of eligibility toward full certification under the Puro Standard.

The facility has successfully completed the preliminary assessment conducted by the Puro team, meeting the minimum criteria for listing as a future supplier on Puro.earth.

The facility has passed the third-party facility audit, verifying compliance with the methodology, as well as output audit, verifying the net volume of removed carbon. The facility has been issued CORCs and continues its removal operations, as well as monitoring and reporting to Puro.earth.

Development status

We monitor a facility’s maturity as it moves toward industrial-scale operations. This status identifies whether a project is in development, under construction, or actively removing carbon from the atmosphere.

The feasibility study is ongoing. The Supplier is still collecting data to prove the concept.

The front-end engineering and design are ready and methodology compliant. There is a clear plan to monitor and measure. The LCA is up to the needed quality level or subject to small improvements. The technology has been used before. There are commercial agreements with the relevant business partners of the facility.

The facility is fully funded and is being implemented. Relevant infrastructure is being built.

The facility is operating as a carbon removal facility.

information

More about GrønGas Vrå A/S

Our carbon removal project focuses on Bioenergy with Carbon Capture and Storage (BECCS).
We partner with several biogas plants in Denmark, where CO₂ from the production of biogas is captured.
The biomass used is waste, such as manure and agricultural leftovers.
The captured CO₂ is liquefied on-site, transported to storage at Esbjerg harbor, and then shipped to an retired oilfield in the North Sea, where it is stored permanently deep underground.
Without this project, CO₂ would be released into the atmosphere.
Our approach ensures transparency, with rigorous measurements at every stage of the process.

BECCS is a technological way of removing CO2 prior to emission into the atmosphere, and therefore the number of co-benefits is limited.
1. The establishment and operation liquefaction and purification facility in the biogas plant and associated CO2 transportation infrastructure can create various local jobs in the plant management, maintenance, waste collection, transportation and logistics thereby supporting the local economy.
2. It could also contribute to the development and construction of the infrastructure needed to transport and store CO2.

sdgs

Sustainable development goals

Only listed sustainable development goals (SDGs) have been assessed according to the Puro standard SDG Assessment Requirements and validated and verified by a VVB.

Take urgent action to combat climate change and its impacts

Climate action

related content

More about our CDR infrastructure

  • Demand

Buy carbon credits

Puro.earth provides the institutional-grade infrastructure and global ecosystem required to navigate an evolving industry with confidence. Through rigorous standards,…

Close up background texture of many black lump charcoal pieces ready for barbecue grill, elevated top view, directly above
  • Supply

Certify carbon credits

As your certification partner, Puro.earth provides the trusted standards, global ecosystem, and digital tools needed to unlock capital and…

  • Infrastructure

Infrastructure

Puro.earth provides the rigorous standards, transparent registry, and digital tools required to turn durable carbon removal into a tangible,…